Floors
Carpet, padding and subfloors may require different access and drying decisions.
Call for a quote. Confirm service availability and terms for your address.
Service guide / Structural drying
After bulk water is removed, affected materials may need measured drying and a documented decision about what can remain. Provider availability is pending.
Call for a quote and confirm availability for your address. Use the guides to prepare for a qualified assessment.

01 / Materials
The quote should name the rooms and material layers being evaluated. If a vanity supply leak reached a shared wall, use the two-sided scope comparison to name cabinet access, the bathroom face and the adjoining-room face.
Carpet, padding and subfloors may require different access and drying decisions.
Trim and wall cavities can retain moisture when paint feels dry. If an air-conditioner leak has stopped but the closet remains damp, use the repair-versus-cleanup worksheet to separate source repair from material assessment and drying.
Closed assemblies can conceal wet areas and change the scope.
02 / Evidence
The proposed equipment and duration should follow the material conditions and documented readings. After a roof leak, the two-trade roof-leak handoff keeps the exterior repair record separate from interior observations, access limits and drying decisions.
01 Which materials are wet?
02 What initial measurements will be recorded?
03 How will progress be checked?
04 What criteria end the drying stage?